Services Guide – Part I


Listen Hawa Amman
105.9 FM

  Required Documents / to be included with site Plans

Up-to-date zoning site plan

Up-to-date plat

Title of Registration

Letter from Property Tax (Musaqafat)  Dept. indicating that no taxes are owed on the building

  Fees and Stamps: 
This will depend on the zoning type and the area (in meters square)  of the structure to be built .
 Where to File an Application for this Service: 
Citizens’ Referral Office at the particular regional office .
  Time frame for Processing:

Two to four weeks from the date an application is filed – Automated Phone Service 4650900

Authority:

Towns and Villages Planning Law of 1966, Building and Zoning Code of 1979, and Higher Zoning Board’s Resolution No. 535/1987, and amendment 412/1990 thereto.

Filing Procedures: 

Filing of application along with site plans at Citizens’ Referral Office (CRO)

Site inspection conducted by authorized engineer
Application review by Chief of Engineering branch
Referral of application to the Zoning Dept. at the Center to verify planned zoning of the land
Application review at the Buildings Division of the Buildings Dept.
Referral of application to the District Committee for a decision
Application is referred back to regional office
Due fees are assessed
Verification of fee assessment by the Accounting Office
Payment of due fees
Issuance of duly signed Construction Permit
Applicant receives the Permit