Required
Documents / to be included with site Plans
Up-to-date zoning site plan
Up-to-date plat
Title of
Registration
Letter from Property Tax (Musaqafat) Dept.
indicating that no taxes are owed on the building
Fees and Stamps:
This will
depend on the zoning type and the area (in meters square) of the
structure to be built .
Where to File an Application for this Service:
Citizens’
Referral Office at the particular regional office .
Time frame for Processing:
Two to four weeks from the date an application is
filed – Automated Phone Service 4650900
Authority:
Towns and
Villages Planning Law of 1966, Building and Zoning Code of 1979, and
Higher Zoning Board’s Resolution No. 535/1987, and amendment 412/1990
thereto.
Filing Procedures:
Filing of application along with site plans at
Citizens’ Referral Office (CRO)
Site
inspection conducted by authorized engineer
Application
review by Chief of Engineering branch
Referral of
application to the Zoning Dept. at the Center to verify planned zoning
of the land
Application
review at the Buildings Division of the Buildings Dept.
Referral of
application to the District Committee for a decision
Application
is referred back to regional office
Due fees
are assessed
Verification of fee assessment by the Accounting Office