Home Page
Site Map
Contact Us
Search :
Vision and Mission
Values and Goals
About Amman
Mayors
Organizational Structure
Working Hours
Services Guide – Part I
Services Guide – Part II
External Relations
Amman Regions
Master Plan
GAM logo
Corporate Social Responsibility Forum
Cultural Center
Greater Amman Publications
Bands
Archtictural Projects
Amman Solid Waste Management & Carbon Finance Project
Gallery
Places To Visit
Tourist Map
links
WIN METROPOLIS
SMS
Services Guide – Part II
Listen Hawa Amman
105.9 FM
1- Connection of Utilities
Required Documents / to be included with site Plans
:
Title of Registration
Up-to-date plat
Fees and Stamps:
None
Where to File an Application for this Service:
Citizens’ Referral Office (CRO) in Municipality headquarters
Time frame for Processing:
One week
Authority:
Instructions issued by GAM
Filing Procedures:
Application is filed at CRO in Municipality headquarters then referred to the Buildings Dept.
Application is signed by Director of Buildings Dept. then referred to the regional office
Application is listed and referred to Buildings clerk for setting up a date for site inspection
Site inspection is conducted, a report of which is sent to head of the Engineering branch
Once reviewed, application is referred to Director of regional office for his signature
Application is referred to Director of Buildings Dept.
Application is signed and referred to head of Buildings Division
Application, along with the recommendations made by head of Buildings Div., is referred back to Director of Buildings Dept.
After review, application is referred to the Mayor’s office
Approval by the Mayor
Official Letters signed by Assistant Chief of Staff for Planning Affairs addressed to the Electric Company and Water Authority are issued to applicant
Applicant receives official letters
Back
Copyright © 2008
Greater Amman Municipality- IT Department - Egovernment Section,
All Rights Reserved